• High-Quality Geotube That Can Be Used for Tailings Slag Treatment
  • High-Quality Geotube That Can Be Used for Tailings Slag Treatment
  • High-Quality Geotube That Can Be Used for Tailings Slag Treatment

High-Quality Geotube That Can Be Used For Tailings Slag Treatment

1. Professional manufacture.
2. Implement strict quality test & control procedure.
3. High quality & Best price.
4. Products could be customerized.
5. Good after-sale service.
6. Fast delivery time.

Description:

High-Quality Geotube That Can Be Used for Tailings Slag Treatment

 

Product Description

 

Geotube is made from high strength polypropylene bag, can also use woven cloth material, choose the product material according to the project actual demand; Common black; Adjusted according to different specifications of products commonly used material 400 gsm; Unlimited length, the width can be multiple image splicing unlimited width, but directly affect the dehydration tube bag material intensity range is wider requirements material strength is higher; Basic order fill height for two-thirds of the diameter of the tube bag; According to the construction site of the grouting machine diameter custom, can according to actual situation or adding medicament (increased solidification speed accelerate spate separation).

 

Item Unit Testing Standard Technical Parameters
GT70X95B GT70X95
Breaking strength MD KN/m ISO 10319-2015 85 85
CD KN/m ISO 10319-2015 105 115
Elongation of break MD % ISO 10319-2015 13 13
CD % ISO 10319-2015 8 8
Sewing Tensile Strength KN/m ISO 10321-2008 70 90
Static Bursting Strength(CBR) KN GB/T 14800-2010 8 9
Equivalent hole size(O90) mm GB/T 14799-2005 0.5 0.45
Permeability(Q50) L/m2/s GB/T 15789-2005 50 35
UV-resistance (500 Hours strength retention) % ASTMD4355-2014 90 90

 

 

This knowledge technology have a three-step process:

Step 1: Filling -- Sludge (dredged material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate Geotube?container's unique fabric confines the fine grains of the material.

Step 2: Dewatering -- Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.

Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.

 

Professional geosynthetics manufacturer
Anhui Zhonglu Engineering Materials Co., Ltd
Summer :86-18056028960